Saving Money, Saving Time
The team also challenged the norm that mass timber is best suited for projects where the wood can be left exposed.
oWOW designed 1510年韦伯斯特 using veneer-based mass timber products, including mass ply panels (MPP) and mass ply laminate (MPL) columns, in an innovative point-supported beam configuration. It is the first prescriptive Type IV-A building in the U.S., and the requirements for this construction type meant they had to cover all the wood with three layers of gypsum wallboard. 然而, the choice to use mass timber still allowed oWOW to realize a $30 million savings in net project cost over that of a traditional concrete project of this scale.
“Wood is certainly a beautiful, 可持续材料, which is important to us,” says oWOW President Andy Ball. “But our real target was speed of construction and cost, and that’s why we used mass timber for 1510年韦伯斯特. And that’s why we were also okay with covering it all up. I think people need to think beyond the beauty of wood and accept the fact that mass timber is just a great building material.”
下载 the case study to read more from the team on realized cost-savings, 结构测试, 施工速度, 和可持续性.
项目详细信息
位置:加州奥克兰
故事: 19 (16 stories of mass timber plus a one-story steel penthouse over a two-level concrete podium)
大小: 179,020平方英尺
建筑类型: Type IV-A over a Type I-A podium
完成: Spring 2025 (scheduled)
项目团队
老板: oWOW
架构师: oWOW设计
结构工程师: DCI工程师
总承包商: oWOW建筑
大型木材安装工: Webcor Timber
Mass Timber Manufacturer:兄弟工程木材
列的承包商: Rothoblaas